Where construction dust settles

Renovation dust does not stay where you can see it. The air carries it; the HVAC pulls it through the vents. After the last trade leaves, fine dust keeps settling onto surfaces that already looked clean.

| Surface | What construction leaves | What the clean does |
|---|---|---|
| Ceiling fans and light fixtures | Settled dust on blades, bulbs and the top of each shade | Dusted from the floor |
| Supply vents and returns | Gray dust on the louvers and in the frame | Covers wiped on the outside |
| New cabinet interiors | Sanding dust and wood chips in every box and drawer | Wiped inside, including the toe-kick |
| Window glass, sills and tracks | Film and dust on the glass, dust packed into the track | Vacuumed, then wiped inside |
| New paint and trim | Painters' haze and protective film, with any drips left for the painter | Haze and film lifted gently with what the finish allows |
| New stainless and glass fixtures | Factory oil, installer prints, sticker residue | Cleared with nothing harsh on a finish not yet cleared |
| Baseboards and door casings | A line of dust along every edge | Wiped by hand, one length at a time |
| Floors | Grit under the dust, dust on top | Vacuumed before any damp mopping |
When this fits, and when a deep clean fits better
A post-construction cleaning is the pass after the trades. If no trades have been in the home, a deep clean without the dust is almost always the right page.
When post-construction cleaning fits
- The project is finished and the debris is gone from the home
- The contractor has done the rough cleanup and swept
- Dust keeps settling after everything looks picked up
- New cabinets, new windows, new paint or new floors need their first real wipe-down before the home gets used
When another service fits better
- The home has not been touched by a project but has gone months without a thorough visit. A deep clean handles buildup, not construction dust.
- The home is still a worksite and other trades are coming back. The final clean waits until nothing else is coming through the door.
- Rough cleaning (debris, drop cloths, taped-off plastic) is the contractor's. We come after that is out.
- The project was a tear-out that touched old paint or plaster. We do not scrape or sand old paint, and if that kind of work is pending, we wait for the trade that handles it.
On the call we go over what the project was, how long ago the trades left and whether the HVAC has run since.
What the visit covers for a post-construction job
Every ledge from the top down, the inside of new cabinets and drawers, the inside of windows with their sills and tracks, vent covers, baseboards, door casings and the outside of new appliances. Floors last, vacuumed first. New finishes get what their care sheets allow, and if the installer taped a note to a slab or a tile, we read it.
A new finish can be fussier than it looks. Milder products on new finishes is worth a word on the call, because stone sealers, new grout and factory-coated metals do not love everything that comes out from under the kitchen sink.
Outside glass above the ground floor is not part of a post-construction cleaning, and hauling debris is not either.
Older rehabs and new builds in Chicago
Chicago's housing is a mix of ages. About 39 percent of the city's housing units were built in 1939 or earlier,1 and about 58 percent were built before 1960.1 At the other end, about 15 percent of units were built in 2000 or later,1 and about 27 percent of units are in two-, three- and four-unit buildings.2
A rehab in an older building usually leaves plaster, old-wood sawdust and drywall side by side; a new build leaves sanding dust from the cabinets and factory oil on the stainless. Older buildings after a rehab has more on rehab dust and old finishes.
